March One Monthly Goal

This isn’t the best picture of it, but almost a year ago I finished piecing Good Night Irene, a SAL that I participated in in 2014. Now, it took me a long time (obviously) to finish the quilt, because 2014 was the year that my little Cassie girl arrived. I had a hard time sitting in front of the sewing machine and then once she arrived, sewing time went out the window! Anyway, my goal for the month is to get the backing sewed together, I have the fabrics sitting here ready to be cut and sewn, and then get it basted. IF I have time I’d like to start quilting it, but since Cassie turns 4 in a little over 2 weeks I’m not sure I’ll have the time! I was really hoping to get this done in March, it just didn’t happen though. Hopefully I’ll have more time than I think and I’ll have it all done before the end of the month, yeah right what am I thinking!

Linking up to Elm Street Quilts.

February OMG Update

Well it wasn’t the easiest tasks I set for myself this month, but I did finish both of them! The first item was Alex’s winter jacket that the dog decided to snack on the zipper. I finally got the darn thing off and it took 2 afternoons to get the new zipper sewed on. It’s NOT even remotely perfect, however I am not a seamstress, I cannot stand mending, but it perfectly wearable and no one would notice that it’s not aligned properly unless I point it out. Alex is happy and it’s one more thing off my sewing table!

The other item I wanted to get done this month was a secret project, my husband’s t-shirt quilt that I don’t even remember WHEN I started! I’ve had the top done for SO very long and I know that I’ve gifted it to him at least twice already over the years – once for his birthday and then again for Christmas (I think the same year!). I knew he was going to be out of town from Sunday to Thursday and I knew if I worked hard I could get the whole thing quilted and bound before he got back and then I could gift it to him for Valentine’s Day! I’m not 100% happy with the quilting, I just meandered all over it – gray thread in the blocks and black thread in the borders. I had a lot of problems with the t-shirts and puckering, it’s been so long they aren’t sticking to the fusible anymore and moved around a lot while I was quilting. The issues in the border are because the end was in sight and I wanted to get it finished, there’s a lot of eyelashing on the back because I was going way too fast. At some point I might take it out and fix it, but for now he’s able to use it and it’s off my list. One of the reasons I was procrastinating on this quilt was because I don’t like piecing backs. It takes so long to get a piece big enough and I’d rather get to the quilting. I was walking through Pat Catan’s (local craft store) and saw the beer can fabric and knew what I could use it for! This is the brand hubby drinks, so I knew I needed it for his quilt. I even went back and got an extra yard so I could use it for the binding. The patches in the corners were chest images from t-shirts or patches from actual shirts he’s worn. He was so surprised to see it done, and that I had even included those pieces in the corners. I have a gazillion more t-shirts I’ve stashed away over the years and I’ll do more quilts at some point, but right now I’ve got too many things to get completed first!

Linking up to Elm Street Quilts, Crazy Mom Quilts and My Quilt Infatuation.

February Goals

I have 1 secret project I want to finish, hopefully by Valentine’s Day that I can’t take a picture of or the secret will be out!!

Our ding-a-ling dog decided to take a bite out of Alex’s coat and it’s been sitting here waiting for the zipper to be replaced. Now I don’t really like mending, and replacing a zipper is really not on my favorites list. This jacket is a Lands End jacket he really likes and right now he’s wearing a size too small winter jacket until I get this fixed. I started taking the stitches out last night, still have a ways to go before the old zipper is totally out there. There’s a lot of stitches in there!

If I can get these 2 items done I might see if I can baste a few quilts that need quilted to prep ahead for March goals.

Linking up to Elm Street Quilts.

January OMG Finishes

I really didn’t think I’d finish all 3 projects, but I did! I was planning on putting the table topper in my Etsy shop, but while I was quilting it I saw a bunch of things that bothered me so much I just couldn’t sell it. So now Cassie will get a new blanket for her dolls. I did very simple quilting because it just didn’t need anything detailed.

The fun part was quilting these 2 double wedding ring runners. I quilted 1/4″ in all the sections and that was the easy part. I had to find the right color fabrics for the bindings and then figure out how to make bias binding and apply it. It was a lot easier than I thought it would be, which is good since at some point I’ll need to do it on a Dear Jane quilt with scallops! Mom might be getting one of these runners, I’ve made her things before for her living room with the same fabrics, the Christmas runner is for my living room during the holidays. I started these in July, the Xmas fabric one was made during our guild event Christmas in July and the other I cut out to use as a practice piece. Glad they are done and off my list!

Onto next month’s challenge!

Linking up to Elm Street Quilts.

January OMG

I know I haven’t been around for awhile, I kinda skipped the month of December when it came to sewing. I had exactly 1 project that I made for Christmas, however I spent a couple of days stitching out candy cane holders for the kids to give their friends at school. I made ornaments for the teachers, but it looks like I didn’t get any pictures of them.

For January, I have 3 items I want to get basted and quilted. 2 table runners that I’m not yet sure what I want to do with and a table topper that will be listed for sale in my etsy shop. I want to start out the year with some small wins before I get into the larger quilts I have left to finish. Not sure if these 3 items will be on my 2018 UFO challenge yet, depends on if they are done before the next guild meeting or after. 🙂 I have the table topper basted today and hope to get started quilting it in the next day or so.

Linking up to Elm Creek Quilts OMG.

November Goals … MET!

I did it! I finished the 2 quilts this month that I wanted to get done this month. It was a VERY busy month, with multiple birthdays and a lot of days that I was helping out at school either in Alex’s classroom or at the Book Fair.

So all I had left to do on the Dear Jane quilt was complete the binding and the applique of the triangles I had completed. Back in 2016 I decided that I just wasn’t happy with the colors in this quilt and I wasn’t going to get back to it. So I finished it with what I had completed. I’m happy with the quilting, it was VERY time consuming since each block was quilted on it’s own, but it was actually worth it. I had many ladies at guild telling me that they’d take it since I wasn’t happy with it. 🙂

My second quilt to get done this month is also a Dear Jane related quilt. In 2012 I signed up to participate in the signature swap. We all made I think it was 50 blocks and signed each one, sent them to the coordinator and then eventually we got one of each person’s block sent to us. Mine didn’t sit here long for me to decide what I was going to do with them.  In January 2013 I finished putting the top together. Then it sat for years until I got it basted and quilted. I’m happy it’s finished and it didn’t take too long to quilt either.

So back to work on something, I have lots of EPP, a knitting project and a Secret Santa box to finish up! Hope everyone had a wonderful Thanksgiving weekend!

Linking up to Elm Street Quilts.

November Goals (OMG)

Ok, so I messed up last month! I did my October OMG post – and then I never linked up!! It’s a good thing though because i never finished my projects! I almost have the Dear Jane finished, I just need to do the applique of the few triangles on the back. I will finish it this month!

 

Since I already have it basted I am going to quilt (and hopefully complete) my Dear Jane Signature quilt.  I’m pretty sure I can get this quilted quickly, as soon as I have the time to do it! I volunteer at my son’s school at least 1 day during the week and this month is the book fair so there’s a few extra days I will be at school. I love helping out with the kids though!!

Linking up with Elm Street Quilts.

Back soon!

October OMG

So I decided to pull out a couple more quilts and get them basted so I can quilt them this month. The first one is a Dear Jane Signature quilt from 2012. Everyone made 50 blocks (if I remember correctly) and sent them to the coordinator who then made sure we all got one of each. It took me a few years to decide how I wanted to set them and decide on the 9 patch as the alternate blocks. I really would love to get this quilted and bound, not sure what I’ll use it for or where I’ll put it, but it will at least be finished!

My second quilt that I basted and want to get quilted is my Dear Jane quilt that I started back in 2009/10. I talked about it here when I finished the top in March, and at the time I was going to just stipple the whole thing. Since I’ve been playing with FMQ lately I decided that each block would be done separately.

October is going to be a busy month, Alex turns 7 in just 8 days and I have a lot to do for the party. I’ve also started helping out in his classroom at school, plus there’s a field trip next week that I’m a chaperone for – so I’m not sure how much sewing time I’m going to get this month!

September OMG Results

It was easier than I thought to finish my projects this month! I decided I needed to practice my FMQ on the table runner and I added some walking foot quilting in other sections. Happy to finally get another item off my todo list. This one has been around since 2008 just waiting to be quilted. I think I originally was going to quilt this on the frame I bought, then I was going to hand quilt it. So, it’s just been sitting here for all these years waiting. Unfortunately I can’t use it on the dining room table right now, which is the intended place for it, due to the dog. She just doesn’t seem to understand she’s not allowed on the table!

So, Sunday I worked on piecing together a backing from a batik I bought when we went to Lolly’s in August (which I’m just now realizing I never posted about!). They had a shelving unit full of batiks already marked with the yardage – and it was on sale for $8 a yard. I bought 2 of the bolts, one of them was this pink batik and almost 6 yards which I knew would be perfect for a backing. Piecing backings is one of the things I do not like about quilting, basting is at the top! So I quickly sewed the backing, got everything taped to the floor in the living room (only place big enough!) and worked on basting while I watched the Browns lose (yet again!). Not only did I get it basted but I started the quilting that night. I’ve been working hard this week and I and hoping to get binding made and machine stitched down today. Since I never got the rugs put back in place Sunday, I need to pull another quilt out and find a backing so I can baste another one. I’m on a roll and want to continue! I’ve bought about 4-5 packages of batting during Craftsy sales so I just need to get backings out.

Linking Elm Street Quilts and NTT.

September OMG

Here’s what I’d like to get done in September – I have 1 large-ish quilt I want to get basted and I have a table runner that I really want to get quilted.

Back in 2015 I finished putting together a scrappy top with some hexies appliquéd on the alternate squares. I think it’s time to pull this out and get it done so we can use it on the couch this winter. Not yet sure how I’ll quilt it, maybe while I baste it I’ll think of something!

Way back in 2008 I made a table runner using my favorite fabrics – Equinox which isn’t being made anymore. I’ve basted it and started quilting it, but I’d like to get all the quilting done this month.

Here’s hoping I get it all done this month! Linking up to Elm Street Quilts.