It was easier than I thought to finish my projects this month! I decided I needed to practice my FMQ on the table runner and I added some walking foot quilting in other sections. Happy to finally get another item off my todo list. This one has been around since 2008 just waiting to be quilted. I think I originally was going to quilt this on the frame I bought, then I was going to hand quilt it. So, it’s just been sitting here for all these years waiting. Unfortunately I can’t use it on the dining room table right now, which is the intended place for it, due to the dog. She just doesn’t seem to understand she’s not allowed on the table!
So, Sunday I worked on piecing together a backing from a batik I bought when we went to Lolly’s in August (which I’m just now realizing I never posted about!). They had a shelving unit full of batiks already marked with the yardage – and it was on sale for $8 a yard. I bought 2 of the bolts, one of them was this pink batik and almost 6 yards which I knew would be perfect for a backing. Piecing backings is one of the things I do not like about quilting, basting is at the top! So I quickly sewed the backing, got everything taped to the floor in the living room (only place big enough!) and worked on basting while I watched the Browns lose (yet again!). Not only did I get it basted but I started the quilting that night. I’ve been working hard this week and I and hoping to get binding made and machine stitched down today. Since I never got the rugs put back in place Sunday, I need to pull another quilt out and find a backing so I can baste another one. I’m on a roll and want to continue! I’ve bought about 4-5 packages of batting during Craftsy sales so I just need to get backings out.
Linking Elm Street Quilts and NTT.
Lovely quilt top. Thanks for linking up with Elm Street Quilts One Monthly Goal and congrats on your finish.
Congrats on meeting your goal! Love the table topper!